The Job

We stripped the outside paint, removed all windows and resealed them using Sikaflex marine, restored the four seasons hatch, replaced the full running gear ( axle, brakes and tyres) resealed the J rails and roof seams and painted with premier plus 4 coats of paint.

Inside we removed the old vinyl floor and replaced it after giving a good coat of decking oil to the plywood floor.

The cabinet doors were replaced with marine plywood. All the interior was painted. Beds restored and new matters bought.

onesidedone

preparation_

The end result

paint_lines_finished

interior_2

A video of the caravan finished is here: https://www.youtube.com/watch?v=8RHJzg0yicI&t=76s

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s